王朝百科
分享
 
 
 

Hornsby Station

王朝百科·作者佚名  2010-05-17  
宽屏版  字体: |||超大  

Hornsby Station
Hornsby Station

Hornsby StationHornsby railway station is a railway station at the junction between the North Shore and Northern railway lines of the CityRail network in Sydney, Australia. It also serves the commercial and residential area of Hornsby.

Under the Clearways Project, Hornsby is to get a new Platform 5 for use by through northbound trains. Existing Platform 4 then becomes a centre turnback platform for Northern line trains via Strathfield (later Epping Chatswood trains via Thornleigh). The additional platform is required in part for the extra trains that will operate when the Epping to Chatswood line opens.

Hornsby concourse was upgraded in the 1990s and was given lifts connecting the concourse with the platforms. Thus it has Easy Access for wheelchairs.

HistoryThe station opened on 17 September 1886 as Hornsby, but was renamed Hornsby Junction on 1 November 1894. On 1 May 1900 it was renamed to Hornsby and has remained with that name to the present day.[1]

On July 10, 2003, this caused the communications system in a Millennium Train to fail because the train's software could not compute that the origin and destination of the service had the same name[1].

Transport LinksShorelink runs a number of services to and from Hornsby railway station:

Route 574 - Hornsby Hospital

Route 587 - Westleigh via Normanhurst

Route 588 - Normanhurst West via Normanhurst

Route 592 - Limited service to Brooklyn and Mooney Mooney

Route 593 - Parklands Road

Route 595 - Mount Colah via Hornsby North

Route 596 - Hornsby Heights

Route 597 - Berowra station via Berowra Heights

Hornsby is also the terminal of NightRide routes N80 and N90, both of which go to Town Hall - N80 via Strathfield, N90 via Chatswood.

Platforms/ServicePlatform 1:

North Shore Line - terminating services; all stations and limited stops services towards Central along the North Shore Line. Peak hour intercity services from Wyong

Platform 2:

North Shore Line - terminating services; all stations services to Berowra; peak hour limited stops services to Wyong.

Northern Line - terminating services; all stations and limited stops services to Central via Strathfield.

Platform 3:

Northern Line - all stations and limited stops services to Central via Strathfield.

Newcastle & Central Coast Line - intercity services to Central.

Countrylink North Coast - country services to Sydney Terminal (Set down only, 3 per day).

Countrylink North Western - country services to Sydney Terminal (Set down only, 1 per day).

Southbound goods trains pass through this platform.

Platform 4:

Current:

Northern Line - terminating services; peak hours all stations and limited stops services to Central via Strathfield.

Newcastle & Central Coast Line - intercity services to Gosford, Wyong & Newcastle.

Countrylink North Coast - country services to Brisbane (1 per day) Casino (1 per day), and Grafton (1 per day).

Countrylink North Western - country services to Armidale and Moree via Werris Creek (1 per day).

This platform also services northbound freight trains.

Future:

Northern Line - All stations and Limited Stops services to Epping, Macquarie University, Macquarie Park, North Ryde, Chatswood, St. Leonards, North Sydney and Central.

Southbound goods trains pass through this platform.

Platform 5 (Currently Under Construction):

Newcastle & Central Coast Line - intercity services to Gosford, Wyong & Newcastle.

Countrylink North Coast - country services to Brisbane (1 per day) Casino (1 per day), and Grafton (1 per day).

Countrylink North Western - country services to Armidale and Moree via Werris Creek (1 per day).

This platform will also service northbound freight trains.

Future:

Northern Line - terminating services; all stations and limited stops services to Epping, Chatswood, St. Leonards, North Sydney and Central.

Trackplan

Hornsby Station

Track layout at Hornsby prior to construction of the fifth platform

 
 
免责声明:本文为网络用户发布,其观点仅代表作者个人观点,与本站无关,本站仅提供信息存储服务。文中陈述内容未经本站证实,其真实性、完整性、及时性本站不作任何保证或承诺,请读者仅作参考,并请自行核实相关内容。
如何用java替换看不见的字符比如零宽空格​十六进制U+200B
 干货   2023-09-10
网页字号不能单数吗,网页字体大小为什么一般都是偶数
 干货   2023-09-06
java.lang.ArrayIndexOutOfBoundsException: 4096
 干货   2023-09-06
Noto Sans CJK SC字体下载地址
 干货   2023-08-30
window.navigator和navigator的区别是什么?
 干货   2023-08-23
js获取referer、useragent、浏览器语言
 干货   2023-08-23
oscache遇到404时会不会缓存?
 干货   2023-08-23
linux下用rm -rf *删除大量文件太慢怎么解决?
 干货   2023-08-08
刀郎新歌破世界纪录!
 娱乐   2023-08-01
js实现放大缩小页面
 干货   2023-07-31
生成式人工智能服务管理暂行办法
 百态   2023-07-31
英语学习:过去完成时The Past Perfect Tense举例说明
 干货   2023-07-31
Mysql常用sql命令语句整理
 干货   2023-07-30
科学家复活了46000年前的虫子
 探索   2023-07-29
英语学习:过去进行时The Past Continuous Tense举例说明
 干货   2023-07-28
meta name="applicable-device"告知页面适合哪种终端设备:PC端、移动端还是自适应
 干货   2023-07-28
只用css如何实现打字机特效?
 百态   2023-07-15
css怎么实现上下滚动
 干货   2023-06-28
canvas怎么画一个三角形?
 干货   2023-06-28
canvas怎么画一个椭圆形?
 干货   2023-06-28
canvas怎么画一个圆形?
 干货   2023-06-28
canvas怎么画一个正方形?
 干货   2023-06-28
中国河南省郑州市金水区蜘蛛爬虫ip大全
 干货   2023-06-22
javascript简易动态时间代码
 干货   2023-06-20
感谢员工的付出和激励的话怎么说?
 干货   2023-06-18
 
>>返回首页<<
 
 
静静地坐在废墟上,四周的荒凉一望无际,忽然觉得,凄凉也很美
© 2005- 王朝网络 版权所有