王朝百科
分享
 
 
 

Edgecliff Station

王朝百科·作者佚名  2010-05-18  
宽屏版  字体: |||超大  

Edgecliff Station
Edgecliff Station

Edgecliff StationEdgecliff railway station is an underground railway station in the inner-Sydney suburb of Edgecliff. The station is on the Eastern Suburbs line, one of the Sydney underground railways. The station was opened in 1979 upon the completion of the line.

LocationThe station is situated behind and below the Eastpoint shopping centre on New South Head Road at Ocean Street, Edgecliff. Access is via New South Head Road or from the bus-rail interchange above the concourse.

The station is not truly underground. The city end of the station is above ground level (but fully enclosed). The Bondi Junction end of the station is below ground. The entirety of the platforms are enclosed, however, with the concourse and bus interchange above it.

HistoryWhilst the Eastern Suburbs Railway was not originally intended to travel via Edgecliff, the first proposal for an Edgecliff Station was in 1947. In 1963 it was suggested that Edgecliff be the terminus of the first stage of the Railway but by 1967 it was decided Bondi Junction was a better terminus location.

The station and bus terminal opened on 23 June 1979.

Platforms/ServiceThe basic service is six trains per hour with additional trains at weekday peak hours. Four trains per hour operate at evenings and on weekends.

Platform 1

Eastern Suburbs & Illawarra Line - all stations and limited stops services to Hurstville, Mortdale, Sutherland, Cronulla, and Waterfall.

South Coast Line - peak hour intercity services to Wollongong, Thirroul and Port Kembla.

Platform 2

Eastern Suburbs & Illawarra Line - all stations services to Bondi Junction.

The Bus-Rail InterchangeUpon opening most bus services travelling past the station towards the city were curtailed to terminate at the station. Despite the 1976 review that caused the design of the bus-rail interchanges at Edgecliff and Bondi Junction to be scaled back, significant work was completed at Edgecliff to better facilitate these bus route changes: a tunnel had been dug under Ocean Street and Edgecliff Rd, around the Edgecliff Post Office to New South Head Road.

Edgecliff track layoutHowever, because the time savings of the train over the bus from Edgecliff were minimal, few passengers opted to utilise the interchange. In later bus timetable revisions all New South Head Road bus services continue to the city and do not use the interchange. In 2006 the interchange is very quiet, being utilised only by services to the city from Bondi Junction (and vice versa) plus those from the city to the Eastern Suburbs continuing east along New South Head Road.

Throughout the late 1990s and early 2000s there have been a number of calls for the site of the interchange to be sold off and the facility closed. As yet nothing has come of this.

Rail Clearways Project UpgradeAlthough not directly mentioned in projects associated with the CityRail Clearways Project, work was taken out at Edgecliff as a part of the Bondi Junction Turnback project. This involved the motorisation and signalling of an emergency crossover located at the "Up" (city) end of Edgecliff Station. Previously it had not been possible to ordinarily terminate trains at Edgecliff. When completed in September 2004 it permitted trains to terminate at Edgecliff and return towards the city. This was necessary to allow the closing of Bondi Junction station while major work was carried out there but allowing the line to otherwise remain open.

Bus ServicesEdgecliff Interchange

Stand A:

200 - Bondi Junction services only

Stand B:

323 - Dover Heights via New South Head Road

324 - Watsons Bay via New South Head Road

325 - Watsons Bay via New South Head Road

Stand C:

Not currently in use - this stand is used only by busess during weekdays(Monday to Friday)PM peak hours only.

323 - Dover Heights via New South Head Road

Stand D:

326 - Bondi Junction via Victoria Road

327 - Bondi Junction

Stand E:

327 - Sydney Gresham Street via Darling Point, Kings Cross

Trackplan

Edgecliff Station

 
 
免责声明:本文为网络用户发布,其观点仅代表作者个人观点,与本站无关,本站仅提供信息存储服务。文中陈述内容未经本站证实,其真实性、完整性、及时性本站不作任何保证或承诺,请读者仅作参考,并请自行核实相关内容。
如何用java替换看不见的字符比如零宽空格​十六进制U+200B
 干货   2023-09-10
网页字号不能单数吗,网页字体大小为什么一般都是偶数
 干货   2023-09-06
java.lang.ArrayIndexOutOfBoundsException: 4096
 干货   2023-09-06
Noto Sans CJK SC字体下载地址
 干货   2023-08-30
window.navigator和navigator的区别是什么?
 干货   2023-08-23
js获取referer、useragent、浏览器语言
 干货   2023-08-23
oscache遇到404时会不会缓存?
 干货   2023-08-23
linux下用rm -rf *删除大量文件太慢怎么解决?
 干货   2023-08-08
刀郎新歌破世界纪录!
 娱乐   2023-08-01
js实现放大缩小页面
 干货   2023-07-31
生成式人工智能服务管理暂行办法
 百态   2023-07-31
英语学习:过去完成时The Past Perfect Tense举例说明
 干货   2023-07-31
Mysql常用sql命令语句整理
 干货   2023-07-30
科学家复活了46000年前的虫子
 探索   2023-07-29
英语学习:过去进行时The Past Continuous Tense举例说明
 干货   2023-07-28
meta name="applicable-device"告知页面适合哪种终端设备:PC端、移动端还是自适应
 干货   2023-07-28
只用css如何实现打字机特效?
 百态   2023-07-15
css怎么实现上下滚动
 干货   2023-06-28
canvas怎么画一个三角形?
 干货   2023-06-28
canvas怎么画一个椭圆形?
 干货   2023-06-28
canvas怎么画一个圆形?
 干货   2023-06-28
canvas怎么画一个正方形?
 干货   2023-06-28
中国河南省郑州市金水区蜘蛛爬虫ip大全
 干货   2023-06-22
javascript简易动态时间代码
 干货   2023-06-20
感谢员工的付出和激励的话怎么说?
 干货   2023-06-18
 
>>返回首页<<
 
 
静静地坐在废墟上,四周的荒凉一望无际,忽然觉得,凄凉也很美
© 2005- 王朝网络 版权所有