王朝百科
分享
 
 
 

Wolli Creek Station

王朝百科·作者佚名  2010-05-22  
宽屏版  字体: |||超大  

Wolli Creek Station
Wolli Creek Station

Wolli Creek StationWolli Creek railway station is in the Sydney suburb of Wolli Creek, on the Sydney CityRail network serves two lines, the Illawarra Line and Airport and East Hills Line. The two lines intersect at almost right angles with the Illawarra line on the surface, and the Airport-East Hills line below ground level. There is one island platform on the four track Illawarra line (platforms 3 and 4) and two platforms below grade on the Airport line (Platforms 1 and 2). Initially the Airport line platforms were built open to the air but they are currently being covered over as part of a housing development. Immediately south of the station on the Illawarra line, a set of points allow trains to cross-over from the 'Illawarra local' tracks to the 'Illawarra' tracks to access platforms 3 and 4. Lifts and stairs connect the platforms and the station entrance, as this is an Easy Access station.

HistoryThe station was built on a former industrial site and siding as part of the new Airport link, which opened in 2000. The name derives from a local creek branching from the Cooks River, and Wolli Junction is the name of the original junction point for the East Hills line from the Illawarra line at this site. In the initial concept for the Airport Line, no station was to be provided at this site, however the State Rail Authority (now RailCorp) decided to construct a station here as an interchange point with the new Airport line and the Illawarra line. The station, unlike the others built on the line, was constructed with government finance and hence is owned by RailCorp. In the initial concept and design phase, the station was designated as 'North Arncliffe', however this was changed to Wolli Creek in 1998 before it opened in 2000. During construction, a set of points allowing the cross-over of trains from the 'Illawarra local' lines to the 'Illawarra main' lines was moved further south. The Airport line tracks are designated as the 'New Southern Railway', this was the original name for the Airport line, and is still the technical name for it. A perceived deficiency of the station is that there is only one island platform on the four track section of the Illawarra line, meaning that peak hour services using the 'Illawarra local' tracks have no means to stop at Wolli Creek. Also, trains from the East Hills line travelling on to Tempe and Sydenham have no platforms at which to stop at Wolli Creek. This deficiency has been identified by Railcorp, and there are long term plans to construct additional platforms at Wolli Creek to enable better interchange of services.

Platforms/ServiceAll trains via the Airport stop at Wolli Creek. These depart on Platform 1 to City and Platform 2 to Macarthur. All trains from Wolli Creek towards the Airport and City are all-stop trains, and almost all trains terminating at East Hills are also all-stop services. Trains terminating at Campbelltown and Macarthur are typically limited-stop services, most stopping at Kingsgrove, Riverwood, Padstow, East Hills then all stations to Campbelltown or Macarthur railway stations. All off-peak South Coast Line and Illawarra Line trains stop at Wolli Creek. Some peak hour services from both of these lines bypass the station as they utilise the 'Illawarra Local' tracks.

Platform 1:

Airport & East Hills Line - all stations services around the City Circle (anticlockwise) via the Airport.

Platform 2:

Airport & East Hills Line - all stations and limited stops services to Kingsgrove, East Hills, Glenfield, Campbelltown and Macarthur.

Platform 3:

Eastern Suburbs & Illawarra Line - all stations services to Bondi Junction.

South Coast Line - intercity services to Central; peak hour intercity services to Bondi Junction.

Platform 4:

Eastern Suburbs & Illawarra Line - all stations and limited stops services to Hurstville, Mortdale, Sutherland, Cronulla and Waterfall.

South Coast Line - intercity services to Thirroul, Wollongong, Port Kembla, Dapto and Kiama.

2008 Wolli Creek Train FireOn April 9 2008, a train caught on fire at Wolli Creek station. Approximately 900-1000 commuters had to be evacuated as an air-conditioning unit of a train began to catch on fire. Passengers were asked to change trains at Wolli Creek station. This event caused train delays of up to 40 minutes. The fire was contained at 8:30am local time.

 
 
免责声明:本文为网络用户发布,其观点仅代表作者个人观点,与本站无关,本站仅提供信息存储服务。文中陈述内容未经本站证实,其真实性、完整性、及时性本站不作任何保证或承诺,请读者仅作参考,并请自行核实相关内容。
如何用java替换看不见的字符比如零宽空格​十六进制U+200B
 干货   2023-09-10
网页字号不能单数吗,网页字体大小为什么一般都是偶数
 干货   2023-09-06
java.lang.ArrayIndexOutOfBoundsException: 4096
 干货   2023-09-06
Noto Sans CJK SC字体下载地址
 干货   2023-08-30
window.navigator和navigator的区别是什么?
 干货   2023-08-23
js获取referer、useragent、浏览器语言
 干货   2023-08-23
oscache遇到404时会不会缓存?
 干货   2023-08-23
linux下用rm -rf *删除大量文件太慢怎么解决?
 干货   2023-08-08
刀郎新歌破世界纪录!
 娱乐   2023-08-01
js实现放大缩小页面
 干货   2023-07-31
生成式人工智能服务管理暂行办法
 百态   2023-07-31
英语学习:过去完成时The Past Perfect Tense举例说明
 干货   2023-07-31
Mysql常用sql命令语句整理
 干货   2023-07-30
科学家复活了46000年前的虫子
 探索   2023-07-29
英语学习:过去进行时The Past Continuous Tense举例说明
 干货   2023-07-28
meta name="applicable-device"告知页面适合哪种终端设备:PC端、移动端还是自适应
 干货   2023-07-28
只用css如何实现打字机特效?
 百态   2023-07-15
css怎么实现上下滚动
 干货   2023-06-28
canvas怎么画一个三角形?
 干货   2023-06-28
canvas怎么画一个椭圆形?
 干货   2023-06-28
canvas怎么画一个圆形?
 干货   2023-06-28
canvas怎么画一个正方形?
 干货   2023-06-28
中国河南省郑州市金水区蜘蛛爬虫ip大全
 干货   2023-06-22
javascript简易动态时间代码
 干货   2023-06-20
感谢员工的付出和激励的话怎么说?
 干货   2023-06-18
 
>>返回首页<<
 
 
 
静静地坐在废墟上,四周的荒凉一望无际,忽然觉得,凄凉也很美
© 2005- 王朝网络 版权所有